Process · 03 · 5 stages, 10 days

From sample to snag-sign-off.

Every EG project follows the same five stages. Timeboxed, signed off in writing, and shown to you before the next begins.

Scroll to walk through each stage

0

Days · typical programme

0

Provisional sums

0%

Dust protection

0yr

Paint guarantee

Survey
01
Day 1Stage 01 / 05

Stage 01 · Day 1

Survey.

A free 45-minute on-site visit. We assess surfaces, measure rooms, check for damp or cracks, and photograph every wall in natural light. You receive a condition report and colour advice.

You receive

  • Condition report
  • Surface assessment
  • Colour recommendations

From you

  • Site access · 45 min
  • Mood board if you have one
  • Direct contact for the property
Spec
02
Days 2–3Stage 02 / 05

Stage 02 · Days 2–3

Spec.

Paint schedule, insulation spec and finish samples — all chosen with physical boards in your hand. Reviewed with you before any quote is signed. We test colours on site if needed.

You receive

  • Paint schedule (PDF)
  • Physical sample boards
  • Insulation spec if applicable

From you

  • One review meeting
  • Decision on colours
  • Sign-off on spec
Quote
03
Day 3Stage 03 / 05

Stage 03 · Day 3

Quote.

An itemised, all-in fixed price — prep, materials, labour, protection, clean-up and guarantee. No provisional sums, no day-rate extras. Once signed, we absorb paint price changes.

You receive

  • Itemised fixed quote (PDF)
  • Programme & start dates
  • Contract & deposit invoice

From you

  • Quote sign-off
  • 30% deposit on order
Prep
04
Days 4–6Stage 04 / 05

Stage 04 · Days 4–6

Prep.

Masking, dust sheets, filling, sanding and priming. We protect floors, furniture and fixtures like they were our own. Every surface is ready before the first coat goes on.

You receive

  • Daily protection photos
  • Filler & sand sign-off
  • Primer coat inspection

From you

  • Clear the rooms if possible
  • Confirm access dates
Finish
05
Days 7–10Stage 05 / 05

Stage 05 · Days 7–10

Finish.

Two or three coats, cut in by brush, rolled with microfibre for zero flash. Insulation installed to spec. Daily clean-down, full snagging and a 10-year guarantee on paintwork.

You receive

  • Painted / insulated rooms
  • Final snagging list
  • 10-yr warranty pack

From you

  • Site access during work
  • 10% balance on sign-off

— Our guarantees

The promises behind every step.

Written into the contract. No small print, no exclusions for the things that actually matter.

Fixed price

No provisional sums. We absorb cost changes after sign-off.

On-time install

98% on-time rate. £100/day credit if we slip.

Clean handover

Full snag list closed within 14 days of completion.

20-yr warranty

Frame, seals, ironmongery — parts and labour.

— Process, in their words

Calm, sequenced, documented.

"Every Friday a photo update from the workshop. We always knew where the project was."

Marlow Reeve

Homeowner · Chiswick

"The drawing pack alone was worth the engagement — clearer than our architect's package."

Jan Doe

Architect · Surrey

"Snag list closed in eleven days. I've never seen that on a glazing job."

Ada Frost

Studio Director · LDN

Ready to start?

Begin with stage 01 — a free site survey.