• Winter Roof MOT£149
  • EPDM Flat Roof Bundlefrom £1,895
  • Chimney Repoint + Lead£595
  • Full Re-roof — 10% OffSave £1,000s
  • Gutter Clean & Seal£120
  • Emergency Leak Response£0 call-out
  • Velux Window Installfrom £895
  • Moss Removal + Treatment£245
  • Fascia, Soffit & Gutteringfrom £1,450
  • Landlord Roof Report£95
  • Winter Roof MOT£149
  • EPDM Flat Roof Bundlefrom £1,895
  • Chimney Repoint + Lead£595
  • Full Re-roof — 10% OffSave £1,000s
  • Gutter Clean & Seal£120
  • Emergency Leak Response£0 call-out
  • Velux Window Installfrom £895
  • Moss Removal + Treatment£245
  • Fascia, Soffit & Gutteringfrom £1,450
  • Landlord Roof Report£95
4.9 · 312 reviews
Live slots
Half-day · from £120

Stack a small job onto next Tuesday's London round.

We cluster small jobs across each borough on Tuesdays and Thursdays. Most are completed in a single visit — bring your own list.

½day

Typical slot

48hr

Booking window

  • Fixed price, no extras
  • All materials included
  • Photo report on completion
4.9 · 312 reviews
Live slots
Case studies · 2024–25

See the exact spec, price & timeline.

Every project documented with before-and-after photos, materials list, and the actual price paid. No staged shots, no stock images.

312+

Projects logged

4.9

Avg rating

  • Written spec on every job
  • Photo report on completion
  • Talk to past clients on request
Soffit & Fascia Cap-Over
#37 · Fixed-price small job · London-wide

Soffit &Fascia Cap-Over.

Rotten timber fascia capped in UPVC with continuous over-fascia vent — keeps the eaves dry and the loft breathing.

Book on WhatsApp +44 7950 135574Pay

From £380

Price

Full day · 2 roofers

Duration

10-year on UPVC

Warranty

London-wide

Coverage

— Overview

What this job actually involves.

Cap-over is a half-day way to refresh a tired fascia run without ripping the whole eaves back. We over-clad the existing timber in 9mm UPVC fascia board, fit a continuous over-fascia ventilator (essential to keep the loft breathing) and finish the soffit underneath with hollow UPVC soffit board. Done before the gutter goes back on.

— Signs you need this

Five things we look for first.

1

Paint peeling on timber fascia, soft when probed

2

Black water marks running down from gutter line

3

Gutter brackets pulling away from the fascia

4

You don't want a full strip-and-renew job

5

Loft showing signs of condensation (eaves blocked)

— Included in the price

A fixed price means a fixed scope.

No hidden extras. Materials, access, disposal and a written guarantee are all in the headline number.

10-year on UPVC
  • Gutters lifted and re-fixed onto new fascia
  • 9mm UPVC fascia board over existing timber
  • Continuous over-fascia ventilator (essential)
  • Hollow UPVC soffit board underneath
  • All trims and end caps in matching colour
  • 10-year manufacturer guarantee on UPVC

— On the day

How we work, step by step.

01

Lift gutter

Gutter unclipped from existing brackets and stored. Original timber checked — if it's structurally rotten through, we'd quote a full renew instead.

02

Fit ventilator

Continuous over-fascia ventilator strip fitted along the top edge — this is what stops the new cap-over from sealing the loft tight.

03

Cap fascia

9mm UPVC fascia board screwed through existing timber into rafter ends with stainless screws every 600mm. Joints capped with H-strips.

04

Re-soffit & gutter

Soffit board clipped in underneath the fascia. Gutter brackets re-fitted to new fascia and gutter clipped back on.

— Materials & kit

What we bring to the van.

The unglamorous detail that decides whether a fix lasts five years or twenty-five. We use trade-grade or manufacturer-spec materials only — never builders' merchant own-brand.

  • 9mm UPVC fascia board (white / black / grey)
  • Continuous over-fascia ventilator
  • Hollow soffit board + J-trim
  • Stainless screws + end caps

— Why book with EG Roofing

The from £380 you see is the from £380 you pay.

Eight advantages built into every fixed-price small job — the things our customers tell us actually matter.

Fixed price, no surprises

Quoted before we arrive. Materials, access and disposal are all in the headline number.

Booked by the half-day

Most jobs slotted within 5–7 working days. Same-week for active leaks.

10-year on UPVC

Written workmanship guarantee on every job, lodged to your email after sign-off.

Before & after photos

WhatsApp photo sign-off before payment — you see the fix even if you're at work.

12+ years on London roofs

Same two-roofer crews — never sub-contracted. Public liability cover £2m.

4.9★ on Google & Checkatrade

Hundreds of reviews from SW19, CR0, BR1, SE and Central London commercial.

Clean site, zero debris

Drives and borders sheeted, all waste taken away in our van — no skip required.

One direct point of contact

WhatsApp the same roofer who quoted you — no call-centre, no chasing.

— Flexible payment

Spread the cost. Interest-free.

Pay how it suits you. Split this from £380 job into 3 interest-free instalments with Klarna or Clearpay, settle in 30 days, or pay by card, bank transfer or cash on completion. Your choice — we don't add a surcharge.

0% APR · No fees · FCA-regulated providers
Klarna.Popular

3 interest-free payments — first today, then every 30 days. Soft credit check, instant decision.

e.g. £380 → 3 × £127

Clearpay.0% APR

4 fortnightly payments — pay over 6 weeks, no interest, no fees if paid on time.

e.g. £380 → 4 × £95

Card on completion

Tap, chip + PIN or contactless via Stripe terminal. Visa, Mastercard, Amex. Receipt by email.

Bank transfer or cash

Faster Payments on the day, or cash on completion. VAT receipt issued for landlords and small businesses.

Klarna and Clearpay are FCA-regulated payment providers. 18+, UK residents, subject to status. Missed payments may affect your ability to use these services. Full T&Cs at klarna.com and clearpay.co.uk.

— Frequently asked

3 answers before you book.

Cap-over or full renew — which?

Cap-over if the timber is sound but tired. Full renew if it's rotten through (probe with a screwdriver). We'd never cap rotten timber — it traps damp.

Why the ventilator?

Without it you create a sealed loft and black mould appears within 12 months. The continuous strip is non-negotiable on any modern fascia install.

Can you match my neighbour's fascia?

Yes — Freefoam and Eurocell both do white, black, anthracite grey, oak and rosewood-effect. We'll bring samples on the quote visit.

— Free quote in 5 steps

Book your soffit & fascia cap-over.

Five quick taps and it lands straight in our WhatsApp — same crew who'd do the job. From £380 · Full day · 2 roofers.

— Free quote · 5 quick steps

Book soffit & fascia cap-over

1 / 5
Median reply 12 min £5m liability No-obligation quote
Booking this week · From £380

Book it.Sorted this week.

From £380 · Full day · 2 roofers · 10-year on UPVC. Klarna & Clearpay accepted.

Median first reply 12 min · Same crew quoted you

— Direct service links

London boroughs we roof every week.

Direct shortcuts to the work we get called for most across South & South-West London. Tap a borough for local case studies, pricing and architecture notes.

Don't see your postcode? We cover all of South & South-West London + Central/East commercial.Check your postcode